Promoters

OLD Country Indicator

Large Hydro (above 30 MW) electricity production

Electricity Produced from power plants using Large Hydro (above 30 MW) as main fuel

Read More

Electricity produced from diesel plants (Grid Connected)

Electricity generated from grid-connected power plants using Diesel as main fuel

Read More

Heavy fuel electricity production

Electricity Production of power plants using Heavy fuel as main fuel

Read More

Type of tariff

Here you see the information on this indicator

Read More

Electricity produced from Gas plants

Electricity generated from power plants using Gas as main fuel

Read More

Electricity produced from Coal

Electricity generated from power plants using Coal as main fuel

Read More

Biofuels obligation/mandate. R04

Mandates  for blending biofuels (Ethanol and Biodiesel) of total transportation fuel in per cent or million litres.

Read More

Coal plants installed capacity

Total installed capacity of power plants connected to the National electrical grid using coal as main fuel

Read More

Net metering. R03

Allows a two-way flow of electricity between the electricity distribution grid and customers with their own generation. Customers pay only for the net electricity used.

Read More

Tradable REC. R06

Certificates provide a tool for trading and meeting renewable energy obligations among consumers and/or producers, and also a means for voluntary green power purchases. They operate by offering 'green certificates' for every kWh or MWh generated by a renewable producer.

Read More

Energy production payment. F04

Direct payment of the government per unit of renewable energy produced.

Read More

Capital subsidy, grant, or rebate. F01

This group of fiscal policy types is characterized by one-time payments by the government to cover a percentage of the capital cost of an investment.

Read More

Public competitive bidding. P02

A tendering system by which contracts to construct and operate specific projects or fixed quantities of renewable capacity are awarded.  Bidding for renewable power capacity can be done at the national or sub-national levels.

Read More

Electric utility quota obligation. R02

Generally called Renewable Portfolio Standard (RPS), renewables obligations or quota policies. A standard requiring that a minimum percentage of generation sold or capacity installed is provided by renewable energy. Obligated utilities are required to ensure that the target is met.

Read More

Slaughtery waste

Slaughtery waste resources used for electricity generation

Read More

Urban liquid waste (sewage)

Quantity of Sewage used for energy production

Read More

Agro-industrial solid waste

Solid Waste from biomass materials produced mainly from food and fibre processing industries

Read More

Heavy Fuel installed capacity

Total Capacity installed of power plants connected to the National electrical grid using Heavy Fuel as main fuel

Read More

Cashew suitability

Climate suitability for the production of Cashew

Read More

Camelina Suitability

Climate suitability for the production of Camelina

Read More

Pages